Built to the maximum width of the canal, ships like this present a delicate challenge.

The positioning/guiding locomotives maneuver their vessel from the one end of the lock to the other, through all the chambers. It means continual and coordinated adjustment of the cables between all the locomotives, including during these roller-coaster type inclines between the chambers.

  ⇽ BACK ⇽